Projects in India | Project Leads | Mega Projects in India
  • Projects
  • L-One Leads
  • Fit-Out Leads
  • Call Now: 7011311045
Select Page

40 MW (AC) Solar Power Plant [Umaria]

by Gurpreet Singh | Jan 4, 2026 | L-One Leads

Sector Contract Type Solar Power Construction of Solar Power Plant Cost (₹ Cr.) State 207 Madhya Pradesh

600 Bedded Hostel Building & Central Library [Bandarsindri]

by Gurpreet Singh | Dec 14, 2025 | Projects

Milestone Cost (₹ Cr) Tender Invited for Contractor 156 Sector State Institutional Building Rajasthan

High Court Building [Amaravati]

by Gurpreet Singh | Dec 14, 2025 | Projects

Milestone Cost (₹ Cr) Tender Invited for Contractor 752 Sector State Administrative Building Andhra Pradesh

116 MW Grid Connected [Kajra]

by Gurpreet Singh | Dec 14, 2025 | Projects

Milestone Cost (₹ Cr) Tender Invited for Contractor 10641 Sector State Transmission & Distribution Bihar

Sewerage & Drainage Network System Modification [Kolkata] (Part of Ward 142)

by Gurpreet Singh | Nov 29, 2025 | L-One Leads

Sector Contract Type Sewage & Effluent Treatment Modification of Sewerage & Drainage Network System Cost (₹ Cr.) State 205 West Bengal
« Older Entries
Next Entries »

View Samples

  • Project Leads
  • L-One (Contracts)
  • Fit-Out Projects

Recent News

  • Doloo Airport: Union Cabinet clears Rs 2,014 crore for the project
    Cabinet Committee on Economic Affairs (CCEA) has given its approval to the development of a new greenfield airport at Doloo in Silchar, Assam. The committee, chaired by the Prime Minister, approved Rs 2,014 crore for the project, which will have a terminal building that will span a total area of 12,351 sqm, with a capacity to handle 800 passengers during peak hours.

    The project encompasses the development of a 2,705m x 45m, Code-4C-compliant runway suitable for A320 aircraft operations, along with the construction of a new apron capable of parking six A320 aircraft and a dedicated isolation bay.
  • Pixxel to develop a satellite manufacturing facility in Bengaluru
    Bengaluru-based space technology firm Pixxel is developing a satellite manufacturing facility near Kempegowda International Airport in Bengaluru.

    The facility, named GigaPixxel, will be spread over 250,000 square feet and is expected to become operational in 2027. Pixxel will invest Rs 350 crore in the project that will have capacity to 100 satellites by December 2027 and  200 satellites by mid-2028.
  • 2.58 lakh sq ft office space leased by AXA Global Business Services in Bengaluru
    French insurance and financial services group AXA's Indian arm, AXA Global Business Services Private Limited, has leased 2.58 lakh sq ft of office space in Bengaluru.

    The space is leased from Sparkle One Mall Developers Private Limited at Phoenix Asia Tower in Hebbal for a period of 10 years. The starting monthly rental will be Rs 2.37 crore, and there will be a 4.75% rent escalation annually.  The total rent out for the tenure will be around Rs 334 crore.
  • India -Nepal rail link: PM Modi and Nepal PM Shah flag off train service from Ayodhya to Janakpur
    Prime Minister Narendra Modi and Prime Minister of Nepal, Balendra Shah, flagged off a new weekly train service (Saryu-Kamala Express) between Janakpur Dham in Nepal and Ayodhya in Uttar Pradesh.

    The Saryu-Kamala Express is crucial for people-to-people and cultural-religious purposes, as it links Janakpur Dham, revered as the birthplace of Mata Sita, and Ayodhya, the birthplace of Lord Shri Ram. 

    The train will cover a 604-km journey in approximately 19 hours and will operate once a week in each direction. It will have 10 intermediate stations, including Ayodhya Dham, Mankapur, Basti, Gorakhpur, Narkatiaganj, Raxaul, Sitamarhi, Shisho, Madhubani and Jainagar. The train will begin regular operations from November 28th, 2026.
  • Dilip Buildcon bags order worth Rs 901 crore from NBCC
    Bhopal-based engineering construction firm Dilip Buildcon has bagged an order worth Rs 901.43 crore from NBCC (India). The order is for the development of a satellite township in Srinagar, Jammu and Kashmir (J&K).

    The firm received a Letter of Award (LoA) for the project, which is part of Satellite Township Phase-I, Package-3. The period of completion of the work is 24 months, or 2 years.