Projects in India | Project Leads | Mega Projects in India
  • Projects
  • L-One Leads
  • Fit-Out Leads
  • Call Now: 7011311045
Select Page

Power Distribution Network Modernization in Dehradun

by Gurpreet Singh | Oct 31, 2026 | L-One Leads

Contract Type Cost (₹ Cr.) Modernization of Power Distribution Network 85 Sector State Transmission & Distribution Uttarakhand

Office Building project in Bhopal

by Gurpreet Singh | Oct 24, 2026 | L-One Leads

Contract Type Cost (₹ Cr.) Construction of Office Building 47 Sector State Administrative Building Madhya Pradesh

Integral Office Complex Cum Service Centre, Rajasthan

by Gurpreet Singh | Oct 24, 2026 | Projects

Milestone Cost (₹ Cr.) Planning 171 Sector State Commercial Complex & Mall Rajasthan

Court Building Project in Tripura

by Gurpreet Singh | Oct 10, 2026 | L-One Leads

Contract Type Cost (₹ Cr.) Construction of Court Building 59 Sector State Administrative Building Tripura

Barti Sub Center Building in Maharashtra

by Gurpreet Singh | Oct 3, 2026 | L-One Leads

Contract Type Cost (₹ Cr.) Construction of Barti Sub Center Building 186 Sector State Institutional Building Maharashtra
« Older Entries

View Samples

  • Project Leads
  • L-One (Contracts)
  • Fit-Out Projects

Recent News

  • Ganga Bridge: PM Modi to inaugurate 6-lane project in Bihar
    Prime Minister Narendra Modi will inaugurate the Kachchi Dargah-Raghopur-Bidupur Ganga bridge in Vaishali, Bihar, on Saturday (21st November 2026). 

    The project is officially named Nitish Setu, after former Bihar Chief Minister Nitish Kumar, and spans 9.76 km, with total approach roads spanning around 13.24 km to nearly 19.76 km overall.

    The project connects Kacchi Dargah (near Deedarganj in south Patna) to Bidupur (near Hajipur in Vaishali district), passing through the Raghopur riverine (diara) area, linking NH 31 to NH 122B. The project is estimated to cost around Rs 5,000 crore.
  • S.M. Group to set up integrated steel complex in Chandrapur
    S.M. Group has announced the signing of a Memorandum of Understanding (MoU) worth Rs 20,000 crore with the Government of Maharashtra. The MoU is for the development of an Integrated Steel and Special Steel Complex at Salori, Chandrapur, Maharashtra.

    The MoU was signed in the presence of Maharashtra Chief Minister Devendra Fadnavis and is aimed at strengthening Chandrapur's position as an emerging industrial destination, particularly in the steel and allied manufacturing sectors. 

    S.M. Group has an established manufacturing base in Jharkhand, with operations spanning sponge iron, MS billets and TMT rebars. Its existing infrastructure includes Direct Reduced Iron (DRI) units, Steel Melting Shop (SMS) facilities, continuous billet casting, and automated rolling mills, supported by captive power generation.
  • IG Defence to develop missile development complex in Nellore
    Noida-based IG Defence has signed a Memorandum of Understanding (MoU) with the Government of Andhra Pradesh for a missile development complex. The firm will develop a 200-acre missile development and manufacturing complex in Nellore.

    This proposed complex will focus on indigenous missile development, micro-missile technologies, propulsion systems, precision-strike capabilities, and advanced defence manufacturing.
  • 31 acres of land acquired by Godrej Properties in Indore
    Real estate major Godrej Properties has acquired 31 acres of land on Indore-Ujjain Road in Indore. The plan is to develop a plotted residential project offering plots of varying sizes, along with infrastructure, recreational spaces, and amenities. The land was purchased for Rs 130 crore, which averages roughly Rs 4.19 crore per acre.
  • Shree Cements plans to set up 3 plants in Andhra Pradesh with an investment of Rs 7,000 crore
    Kolkata-based cement maker Shree Cement Ltd has plans to set up 3 new plants in Andhra Pradesh. The firm plans to establish cement plants in three districts: Kadapa, Anakapalli, and Guntur, with an investment of Rs 7,000 crore.

    This comes because of the incentives offered by the Andhra Pradesh state government under AP Industrial Policy 4.0, which offer fast-track land allotment, a capital subsidy of 12% to 15% of Fixed Capital Investment (FCI), power cost subsidies, and 100% reimbursement of Net State GST (SGST) for five years, alongside 100% reimbursement on stamp duty and land conversion charges based on project eligibility.